Mojro for Industrial & Manufacturing

From compliance to production deadlines - standard planning tools weren't built for this.

Industrial logistics have massive constraints that consumer planning tools can't manage. Mojro handles everything, from axle weight limits, oversized load permits, hazmat separation, to inter-plant transfers tied to production cycles, with ease.

Trusted by best logistics teams

Poor planning in industrial logistics has consequences beyond just a late delivery

The old way

Axle weight limits checked manually after route is committed

Oversized load permits planned separately from transport scheduling

Inter-plant transfers scheduled by email with no optimization

Outbound delivery consolidated without weight distribution optimization

Inbound raw material deliveries disconnected from production schedule

Mojro way

Axle weight distribution modeled simultaneously with route and load

Permit requirements modeled as constraints - only compliant routes generated

Inter-plant transfers optimized as middle-mile legs in the same run

Outbound loads space-and-weight-optimized simultaneously with route

Inbound scheduling aligned to production sequence requirements

Every industrial constraint resolved, from day one.

Every plan compliant before the vehicle even moves

Gross vehicle weight and axle load distribution modeled simultaneously with route.

Load permits, restrictions, clearances - all in the plan

Height clearances, road restrictions, and oversize load time-of-travel constraints are modeled at planning.

Plant-to-plant moves - part of one connected plan

Inter-plant transfer scheduling optimized as middle-mile legs alongside inbound and outbound movements, in one connected plan.

Inbound deliveries sequenced to the production line

JIT delivery windows modeled as hard constraints with raw materials and components arrive exactly when the production schedule demands.

Hazardous materials handled without compromise

Hazardous materials constraints and documentation requiremets are modeled and planned for automatically.

Production commitments never missed

With long-term supply agreements and key accounts delivery windows modeled as hard constraints, production commitments are never missed.

What better planning can deliver - in numbers.

100%

Adherence to delivery SLA's

10%

Logistic Cost Savings

20%

Improvement in vehicle utilization

Measured across live industrial and manufacturing operations.

Compliance built in, production aligned, get the job done.

Let’s Get Started

99.9%

Executable
Plans